210.1 Description
This specification is applicable for projects or work involving either inch-pound or SI units. Within the text and accompanying tables, the inch-pound units are given preference followed by SI units shown within parentheses.
210.2 Submittals
The submittal requirements of this specification item may include:
A. Source, gradation and TxDoT test results for the crushed limestone material,
B. Notification that the crushed limestone is completed and ready for testing, and
C. Field density test results for in-place compacted flexible base,
A. Mineral Aggregate
The material shall be crushed argillaceous limestone meeting the requirements specified herein. The material shall be from sources approved by the Utility and shall consist of durable crushed stone that has been screened to the required gradation.
Flexible base materials shall be tested according to the following TxDoT standard test methods:
|
a) Preparation for Soil Constants and Sieve Analysis |
Tex-101-E |
|
b) Liquid Limit |
Tex-104-E |
|
c) Plastic Limit |
Tex-105-E |
|
d) Plasticity Index |
Tex-106-E |
|
e) Sieve Analysis |
Tex-110-E |
|
f) Wet Ball Mill |
Tex-116-E |
|
g) Triaxial Test |
Tex-117-E, Part II |
Base material shall be stockpiled after crushing and may be then tested by the Utilities designated laboratory and approved by the Engineer or designated representative prior to being hauled to the Project.
The material shall be well graded and shall meet the following requirements:
|
Sieve Designation |
Other Requirements |
% Retained |
|
|
|
US |
SI |
|
|
|
|
1 3/4" |
45 mm |
|
0 |
|
|
7/8" |
22.4 mm |
|
10-35 |
|
|
3/8" |
9.5 mm |
|
30-50 |
|
|
#4 |
4.75 mm |
|
45-65 |
|
|
#40 |
425 mm |
|
70-85 |
|
|
|
|
Maximum Plasticity Index |
|
10 |
|
|
|
Maximum Wet Ball Mill |
|
42 |
|
Maximum Increase in passing #40 (425 mm) sieve from Wet Ball Mill Test |
20 |
|
||
Minimum compressive strength when subjected to the triaxial test shall be 35 psi at 0 psi lateral pressure and 175 psi at 15 psi lateral pressure.
210.6 Measurement
When included in contract for separate payment, "Flexible Base" will be measured by the cubic yard, complete in place, as indicated in the Contract Documents.
Work performed and material furnished as prescribed by this item will be subsidiary to item no 510 “Pipe” unless included as a separate bid item in the contract. When included for payment, it will be paid for at the contract unit bid price for "Flexible Base". The unit bid price shall include full compensation for all work specified herein, including the furnishing, hauling, placing and compacting of all materials; for rolling, proof rolling, recompacting and refinishing; for all water required; for retesting as necessary; for priming; and for all equipment, tools, labor and incidentals necessary to complete the Work.
Payment will be made under one of the following:
Pay Item: Flexible Base Per Cubic Yard.