{"id":31295,"date":"2025-12-08T13:29:38","date_gmt":"2025-12-08T19:29:38","guid":{"rendered":"https:\/\/www.nbutexas.com\/?p=31295"},"modified":"2026-03-18T09:08:13","modified_gmt":"2026-03-18T14:08:13","slug":"gruene-road-sewer-main-rehab-relocation-jan-2026","status":"publish","type":"post","link":"https:\/\/www.nbutexas.com\/es\/gruene-road-sewer-main-rehab-relocation-jan-2026\/","title":{"rendered":"New Braunfels Utilities Gruene Road Sewer Main Rehabilitation and Relocation Project Expected to Begin Jan. 2026"},"content":{"rendered":"\n<p><strong><span style=\"text-decoration: underline;\">FOR IMMEDIATE RELEASE<\/span><\/strong><br>Contact: Charlcee Cervantez<br>Senior Communications Specialist<br>830.312.7915 |&nbsp;<a href=\"mailto:communications@nbutexas.com\" target=\"_blank\" rel=\"noreferrer noopener\">communications@nbutexas.com<\/a><\/p>\n\n\n\n<p>NEW BRAUNFELS, Texas (December 8, 2025) \u2013 New Braunfels Utilities (NBU) is expected to begin construction on the Gruene Road Sewer Main Rehabilitation and Relocation Project, January 2026 and end in May 2026, weather permitting. The project, identified in NBU\u2019s Wastewater Master Plan, will increase the capacity and reliability of wastewater service and odor control for the historic Gruene area.<\/p>\n\n\n\n<p>The Gruene Road Sewer Main Rehabilitation and Relocation Project involves replacing an existing 12-inch sewer main with a larger 18-inch main in downtown Gruene. It also includes installing a new odor control unit along the 1200 block of Gruene Road to address existing odor issues. Additionally, NBU will replace aging 6-inch and 8-inch cast-iron siphon lines that cross the Guadalupe River at Gruene Road. The project is budgeted at $7 million.<\/p>\n\n\n\n<p>The project is divided into two phases with specific timelines and traffic impacts as follows:<\/p>\n\n\n\n<h4 class=\"wp-block-heading\">Downtown Gruene Phase \u2013 Expected: Jan. 2026 to March 2026<\/h4>\n\n\n\n<p>Traffic flow and parking will be impacted weekdays, <strong>Monday through Thursday, 7 a.m. through 11 p.m.<\/strong>, as follows:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Gruene Road:<\/strong> Southbound traffic will operate one-way from New Braunfels Street south to Hunter Road. Northbound access is limited to local traffic reaching the parking lot only; through-traffic is prohibited.<\/li>\n\n\n\n<li><strong>Hunter Road:<\/strong> Street parking is prohibited between Gruene Road and New Braunfels Street. Westbound traffic may only turn left onto Gruene Road. Eastbound traffic remains unimpacted.<\/li>\n\n\n\n<li><strong>New Braunfels Street:<\/strong> Normal traffic flow.<\/li>\n<\/ul>\n\n\n\n<p>Overnight full closures are expected <strong>from Sunday nights through Friday mornings, from 11 p.m. to 7 a.m.<\/strong> Drivers should prepare for detours as construction crews work overnight due to the following:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Gruene Road and Hunter Road<\/strong> will both be subject to <strong>full road closures<\/strong>.<\/li>\n\n\n\n<li><strong>New Braunfels Street<\/strong> will be reduced to one lane of two-way traffic, managed by flaggers.<\/li>\n<\/ul>\n\n\n\n<p>Weekend traffic and parking impacts will be in effect from <strong>Friday through Sunday, from 7 a.m. to 11 p.m.,<\/strong> as follows:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Gruene Road:<\/strong> Southbound traffic is unimpacted. Northbound traffic is restricted to local access for the parking lot only; through traffic is prohibited.<\/li>\n\n\n\n<li><strong>Hunter Road:<\/strong> Traffic flow is unimpacted in both directions, but street parking remains prohibited between Gruene Road and New Braunfels Street.<\/li>\n<\/ul>\n\n\n\n<h4 class=\"wp-block-heading\"><strong>River Phase \u2013 Expected: March 2026 to May 2026<\/strong><\/h4>\n\n\n\n<p>Updates and details about this phase will be provided closer to the start date. The goal is to minimize the impact on the area.<\/p>\n\n\n\n<p>New Braunfels Utilities is committed to investing in critical infrastructure to provide reliable service and ensure the long-term health of the growing community.<\/p>\n\n\n\n<p>Due to the nature of this project and possible weather impacts, dates and timelines are subject to change. For the latest information, visit the NBU capital improvement page at <a href=\"https:\/\/www.nbutexas.com\/capital-improvement\/\" target=\"_blank\" rel=\"noreferrer noopener\">https:\/\/www.nbutexas.com\/capital-improvement<\/a>, follow NBU\u2019s social media channels, or call NBU Customer Service at <strong>830.629.8400<\/strong>.<\/p>\n\n\n\n<p><strong>Traffic Impact Maps<\/strong>:<\/p>\n\n\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"1024\" data-id=\"31300\" src=\"https:\/\/www.nbutexas.com\/wp-content\/uploads\/2025\/12\/WEEKEND-TRAFFIC-PATTERNS-1024x1024.png\" alt=\"\" class=\"wp-image-31300\" srcset=\"https:\/\/www.nbutexas.com\/wp-content\/uploads\/2025\/12\/WEEKEND-TRAFFIC-PATTERNS-1024x1024.png 1024w, https:\/\/www.nbutexas.com\/wp-content\/uploads\/2025\/12\/WEEKEND-TRAFFIC-PATTERNS-300x300.png 300w, https:\/\/www.nbutexas.com\/wp-content\/uploads\/2025\/12\/WEEKEND-TRAFFIC-PATTERNS-150x150.png 150w, https:\/\/www.nbutexas.com\/wp-content\/uploads\/2025\/12\/WEEKEND-TRAFFIC-PATTERNS-768x769.png 768w, https:\/\/www.nbutexas.com\/wp-content\/uploads\/2025\/12\/WEEKEND-TRAFFIC-PATTERNS-1200x1201.png 1200w, https:\/\/www.nbutexas.com\/wp-content\/uploads\/2025\/12\/WEEKEND-TRAFFIC-PATTERNS-576x576.png 576w, https:\/\/www.nbutexas.com\/wp-content\/uploads\/2025\/12\/WEEKEND-TRAFFIC-PATTERNS.png 1519w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"1024\" data-id=\"31298\" src=\"https:\/\/www.nbutexas.com\/wp-content\/uploads\/2025\/12\/WEEKDAY-TRAFFIC-PATTERNS-1024x1024.png\" alt=\"\" class=\"wp-image-31298\" srcset=\"https:\/\/www.nbutexas.com\/wp-content\/uploads\/2025\/12\/WEEKDAY-TRAFFIC-PATTERNS-1024x1024.png 1024w, https:\/\/www.nbutexas.com\/wp-content\/uploads\/2025\/12\/WEEKDAY-TRAFFIC-PATTERNS-300x300.png 300w, https:\/\/www.nbutexas.com\/wp-content\/uploads\/2025\/12\/WEEKDAY-TRAFFIC-PATTERNS-150x150.png 150w, https:\/\/www.nbutexas.com\/wp-content\/uploads\/2025\/12\/WEEKDAY-TRAFFIC-PATTERNS-768x769.png 768w, https:\/\/www.nbutexas.com\/wp-content\/uploads\/2025\/12\/WEEKDAY-TRAFFIC-PATTERNS-1200x1201.png 1200w, https:\/\/www.nbutexas.com\/wp-content\/uploads\/2025\/12\/WEEKDAY-TRAFFIC-PATTERNS-576x576.png 576w, https:\/\/www.nbutexas.com\/wp-content\/uploads\/2025\/12\/WEEKDAY-TRAFFIC-PATTERNS.png 1519w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"1024\" data-id=\"31302\" src=\"https:\/\/www.nbutexas.com\/wp-content\/uploads\/2025\/12\/WEEKNIGHT-TRAFFIC-PATTERNS-1024x1024.png\" alt=\"\" class=\"wp-image-31302\" srcset=\"https:\/\/www.nbutexas.com\/wp-content\/uploads\/2025\/12\/WEEKNIGHT-TRAFFIC-PATTERNS-1024x1024.png 1024w, https:\/\/www.nbutexas.com\/wp-content\/uploads\/2025\/12\/WEEKNIGHT-TRAFFIC-PATTERNS-300x300.png 300w, https:\/\/www.nbutexas.com\/wp-content\/uploads\/2025\/12\/WEEKNIGHT-TRAFFIC-PATTERNS-150x150.png 150w, https:\/\/www.nbutexas.com\/wp-content\/uploads\/2025\/12\/WEEKNIGHT-TRAFFIC-PATTERNS-768x769.png 768w, https:\/\/www.nbutexas.com\/wp-content\/uploads\/2025\/12\/WEEKNIGHT-TRAFFIC-PATTERNS-1200x1201.png 1200w, https:\/\/www.nbutexas.com\/wp-content\/uploads\/2025\/12\/WEEKNIGHT-TRAFFIC-PATTERNS-576x576.png 576w, https:\/\/www.nbutexas.com\/wp-content\/uploads\/2025\/12\/WEEKNIGHT-TRAFFIC-PATTERNS.png 1519w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n<\/figure>\n\n\n\n<p class=\"has-text-align-center\"># # #<\/p>\n\n\n\n<p><strong><u>About New Braunfels Utilities:<\/u><\/strong><\/p>\n\n\n\n<p>New Braunfels Utilities (NBU) is a nonprofit, community-owned provider of electric, water and wastewater services. NBU strives to be a trusted community partner with a mission of providing resilient essential services to over 60,000 customers. Utility revenues are continually invested back into the very systems that provide electricity and water to our customers\u2019 homes and businesses. Additionally, New Braunfels Utilities makes an annual transfer to the City of New Braunfels, which in turn helps to pay for services such as fire, police and city parks. NBU is governed by a Board of Trustees comprised of the mayor and four appointed residents. Visit nbutexas.com to learn more about our services and follow NBU on Facebook at facebook.com\/newbraunfelsutilities, on X at @nbutexas or on Instagram at @nbutexas.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>FOR IMMEDIATE RELEASE Contact: Charlcee Cervantez Senior Communications Specialist 830.312.7915 |&nbsp;communications@nbutexas.com NEW BRAUNFELS, Texas (December 8, 2025) \u2013 New Braunfels\u2026<\/p>\n","protected":false},"author":30,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1],"news-category":[7],"class_list":["post-31295","post","type-post","status-publish","format-standard","hentry","category-uncategorized","news-category-news-releases"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>New Braunfels Utilities Gruene Road Sewer Main Rehabilitation and Relocation Project Expected to Begin Jan. 2026 - New Braunfels Utilities Website<\/title>\n<meta name=\"description\" content=\"NBU begins the Gruene Road Sewer Main Rehabilitation and Relocation Project in Jan. 2026 to improve capacity, reliability, and odor control in historic Gruene.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.nbutexas.com\/es\/gruene-road-sewer-main-rehab-relocation-jan-2026\/\" \/>\n<meta property=\"og:locale\" content=\"es_ES\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"New Braunfels Utilities Gruene Road Sewer Main Rehabilitation and Relocation Project Expected to Begin Jan. 2026 - New Braunfels Utilities Website\" \/>\n<meta property=\"og:description\" content=\"NBU begins the Gruene Road Sewer Main Rehabilitation and Relocation Project in Jan. 2026 to improve capacity, reliability, and odor control in historic Gruene.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.nbutexas.com\/es\/gruene-road-sewer-main-rehab-relocation-jan-2026\/\" \/>\n<meta property=\"og:site_name\" content=\"New Braunfels Utilities Website\" \/>\n<meta property=\"article:published_time\" content=\"2025-12-08T19:29:38+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-03-18T14:08:13+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.nbutexas.com\/wp-content\/uploads\/2025\/12\/WEEKEND-TRAFFIC-PATTERNS-1024x1024.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"1024\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Kirven Baker\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Kirven Baker\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.nbutexas.com\\\/es\\\/gruene-road-sewer-main-rehab-relocation-jan-2026\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.nbutexas.com\\\/es\\\/gruene-road-sewer-main-rehab-relocation-jan-2026\\\/\"},\"author\":{\"name\":\"Kirven Baker\",\"@id\":\"https:\\\/\\\/www.nbutexas.com\\\/es\\\/#\\\/schema\\\/person\\\/257447be5d96f3c53a93c8e2a78418b6\"},\"headline\":\"New Braunfels Utilities Gruene Road Sewer Main Rehabilitation and Relocation Project Expected to Begin Jan. 2026\",\"datePublished\":\"2025-12-08T19:29:38+00:00\",\"dateModified\":\"2026-03-18T14:08:13+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.nbutexas.com\\\/es\\\/gruene-road-sewer-main-rehab-relocation-jan-2026\\\/\"},\"wordCount\":610,\"image\":{\"@id\":\"https:\\\/\\\/www.nbutexas.com\\\/es\\\/gruene-road-sewer-main-rehab-relocation-jan-2026\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.nbutexas.com\\\/wp-content\\\/uploads\\\/2025\\\/12\\\/WEEKEND-TRAFFIC-PATTERNS-1024x1024.png\",\"inLanguage\":\"es-ES\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.nbutexas.com\\\/es\\\/gruene-road-sewer-main-rehab-relocation-jan-2026\\\/\",\"url\":\"https:\\\/\\\/www.nbutexas.com\\\/es\\\/gruene-road-sewer-main-rehab-relocation-jan-2026\\\/\",\"name\":\"New Braunfels Utilities Gruene Road Sewer Main Rehabilitation and Relocation Project Expected to Begin Jan. 2026 - New Braunfels Utilities Website\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.nbutexas.com\\\/es\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.nbutexas.com\\\/es\\\/gruene-road-sewer-main-rehab-relocation-jan-2026\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.nbutexas.com\\\/es\\\/gruene-road-sewer-main-rehab-relocation-jan-2026\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.nbutexas.com\\\/wp-content\\\/uploads\\\/2025\\\/12\\\/WEEKEND-TRAFFIC-PATTERNS-1024x1024.png\",\"datePublished\":\"2025-12-08T19:29:38+00:00\",\"dateModified\":\"2026-03-18T14:08:13+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/www.nbutexas.com\\\/es\\\/#\\\/schema\\\/person\\\/257447be5d96f3c53a93c8e2a78418b6\"},\"description\":\"NBU begins the Gruene Road Sewer Main Rehabilitation and Relocation Project in Jan. 2026 to improve capacity, reliability, and odor control in historic Gruene.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.nbutexas.com\\\/es\\\/gruene-road-sewer-main-rehab-relocation-jan-2026\\\/#breadcrumb\"},\"inLanguage\":\"es-ES\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.nbutexas.com\\\/es\\\/gruene-road-sewer-main-rehab-relocation-jan-2026\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"es-ES\",\"@id\":\"https:\\\/\\\/www.nbutexas.com\\\/es\\\/gruene-road-sewer-main-rehab-relocation-jan-2026\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.nbutexas.com\\\/wp-content\\\/uploads\\\/2025\\\/12\\\/WEEKEND-TRAFFIC-PATTERNS-1024x1024.png\",\"contentUrl\":\"https:\\\/\\\/www.nbutexas.com\\\/wp-content\\\/uploads\\\/2025\\\/12\\\/WEEKEND-TRAFFIC-PATTERNS-1024x1024.png\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.nbutexas.com\\\/es\\\/gruene-road-sewer-main-rehab-relocation-jan-2026\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.nbutexas.com\\\/es\\\/servicio-residencial-y-comercial\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"New Braunfels Utilities Gruene Road Sewer Main Rehabilitation and Relocation Project Expected to Begin Jan. 2026\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.nbutexas.com\\\/es\\\/#website\",\"url\":\"https:\\\/\\\/www.nbutexas.com\\\/es\\\/\",\"name\":\"New Braunfels Utilities Website\",\"description\":\"Your Utility&#039;s Site\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.nbutexas.com\\\/es\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"es-ES\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.nbutexas.com\\\/es\\\/#\\\/schema\\\/person\\\/257447be5d96f3c53a93c8e2a78418b6\",\"name\":\"Kirven Baker\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"New Braunfels Utilities Gruene Road Sewer Main Rehabilitation and Relocation Project Expected to Begin Jan. 2026 - New Braunfels Utilities Website","description":"NBU begins the Gruene Road Sewer Main Rehabilitation and Relocation Project in Jan. 2026 to improve capacity, reliability, and odor control in historic Gruene.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.nbutexas.com\/es\/gruene-road-sewer-main-rehab-relocation-jan-2026\/","og_locale":"es_ES","og_type":"article","og_title":"New Braunfels Utilities Gruene Road Sewer Main Rehabilitation and Relocation Project Expected to Begin Jan. 2026 - New Braunfels Utilities Website","og_description":"NBU begins the Gruene Road Sewer Main Rehabilitation and Relocation Project in Jan. 2026 to improve capacity, reliability, and odor control in historic Gruene.","og_url":"https:\/\/www.nbutexas.com\/es\/gruene-road-sewer-main-rehab-relocation-jan-2026\/","og_site_name":"New Braunfels Utilities Website","article_published_time":"2025-12-08T19:29:38+00:00","article_modified_time":"2026-03-18T14:08:13+00:00","og_image":[{"width":1024,"height":1024,"url":"https:\/\/www.nbutexas.com\/wp-content\/uploads\/2025\/12\/WEEKEND-TRAFFIC-PATTERNS-1024x1024.png","type":"image\/png"}],"author":"Kirven Baker","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Kirven Baker","Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.nbutexas.com\/es\/gruene-road-sewer-main-rehab-relocation-jan-2026\/#article","isPartOf":{"@id":"https:\/\/www.nbutexas.com\/es\/gruene-road-sewer-main-rehab-relocation-jan-2026\/"},"author":{"name":"Kirven Baker","@id":"https:\/\/www.nbutexas.com\/es\/#\/schema\/person\/257447be5d96f3c53a93c8e2a78418b6"},"headline":"New Braunfels Utilities Gruene Road Sewer Main Rehabilitation and Relocation Project Expected to Begin Jan. 2026","datePublished":"2025-12-08T19:29:38+00:00","dateModified":"2026-03-18T14:08:13+00:00","mainEntityOfPage":{"@id":"https:\/\/www.nbutexas.com\/es\/gruene-road-sewer-main-rehab-relocation-jan-2026\/"},"wordCount":610,"image":{"@id":"https:\/\/www.nbutexas.com\/es\/gruene-road-sewer-main-rehab-relocation-jan-2026\/#primaryimage"},"thumbnailUrl":"https:\/\/www.nbutexas.com\/wp-content\/uploads\/2025\/12\/WEEKEND-TRAFFIC-PATTERNS-1024x1024.png","inLanguage":"es-ES"},{"@type":"WebPage","@id":"https:\/\/www.nbutexas.com\/es\/gruene-road-sewer-main-rehab-relocation-jan-2026\/","url":"https:\/\/www.nbutexas.com\/es\/gruene-road-sewer-main-rehab-relocation-jan-2026\/","name":"New Braunfels Utilities Gruene Road Sewer Main Rehabilitation and Relocation Project Expected to Begin Jan. 2026 - New Braunfels Utilities Website","isPartOf":{"@id":"https:\/\/www.nbutexas.com\/es\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.nbutexas.com\/es\/gruene-road-sewer-main-rehab-relocation-jan-2026\/#primaryimage"},"image":{"@id":"https:\/\/www.nbutexas.com\/es\/gruene-road-sewer-main-rehab-relocation-jan-2026\/#primaryimage"},"thumbnailUrl":"https:\/\/www.nbutexas.com\/wp-content\/uploads\/2025\/12\/WEEKEND-TRAFFIC-PATTERNS-1024x1024.png","datePublished":"2025-12-08T19:29:38+00:00","dateModified":"2026-03-18T14:08:13+00:00","author":{"@id":"https:\/\/www.nbutexas.com\/es\/#\/schema\/person\/257447be5d96f3c53a93c8e2a78418b6"},"description":"NBU begins the Gruene Road Sewer Main Rehabilitation and Relocation Project in Jan. 2026 to improve capacity, reliability, and odor control in historic Gruene.","breadcrumb":{"@id":"https:\/\/www.nbutexas.com\/es\/gruene-road-sewer-main-rehab-relocation-jan-2026\/#breadcrumb"},"inLanguage":"es-ES","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.nbutexas.com\/es\/gruene-road-sewer-main-rehab-relocation-jan-2026\/"]}]},{"@type":"ImageObject","inLanguage":"es-ES","@id":"https:\/\/www.nbutexas.com\/es\/gruene-road-sewer-main-rehab-relocation-jan-2026\/#primaryimage","url":"https:\/\/www.nbutexas.com\/wp-content\/uploads\/2025\/12\/WEEKEND-TRAFFIC-PATTERNS-1024x1024.png","contentUrl":"https:\/\/www.nbutexas.com\/wp-content\/uploads\/2025\/12\/WEEKEND-TRAFFIC-PATTERNS-1024x1024.png"},{"@type":"BreadcrumbList","@id":"https:\/\/www.nbutexas.com\/es\/gruene-road-sewer-main-rehab-relocation-jan-2026\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.nbutexas.com\/es\/servicio-residencial-y-comercial\/"},{"@type":"ListItem","position":2,"name":"New Braunfels Utilities Gruene Road Sewer Main Rehabilitation and Relocation Project Expected to Begin Jan. 2026"}]},{"@type":"WebSite","@id":"https:\/\/www.nbutexas.com\/es\/#website","url":"https:\/\/www.nbutexas.com\/es\/","name":"New Braunfels Utilities Website","description":"Your Utility&#039;s Site","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.nbutexas.com\/es\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"es-ES"},{"@type":"Person","@id":"https:\/\/www.nbutexas.com\/es\/#\/schema\/person\/257447be5d96f3c53a93c8e2a78418b6","name":"Kirven Baker"}]}},"_links":{"self":[{"href":"https:\/\/www.nbutexas.com\/es\/wp-json\/wp\/v2\/posts\/31295","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.nbutexas.com\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.nbutexas.com\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.nbutexas.com\/es\/wp-json\/wp\/v2\/users\/30"}],"replies":[{"embeddable":true,"href":"https:\/\/www.nbutexas.com\/es\/wp-json\/wp\/v2\/comments?post=31295"}],"version-history":[{"count":7,"href":"https:\/\/www.nbutexas.com\/es\/wp-json\/wp\/v2\/posts\/31295\/revisions"}],"predecessor-version":[{"id":31929,"href":"https:\/\/www.nbutexas.com\/es\/wp-json\/wp\/v2\/posts\/31295\/revisions\/31929"}],"wp:attachment":[{"href":"https:\/\/www.nbutexas.com\/es\/wp-json\/wp\/v2\/media?parent=31295"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.nbutexas.com\/es\/wp-json\/wp\/v2\/categories?post=31295"},{"taxonomy":"news-category","embeddable":true,"href":"https:\/\/www.nbutexas.com\/es\/wp-json\/wp\/v2\/news-category?post=31295"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}