Developer Driven Projects and Impact Fees

Developer Driven Projects and Impact Fees | New Braunfels Utilities

Guidance, Fees, and Project Documentation for Developers

Developer driven projects often include new or expanded water and wastewater infrastructure or connections within NBU’s service area.

To support responsible growth while balancing the cost of capital improvements, New Braunfels Utilities has established guidelines and fee structures that help ensure infrastructure costs are shared fairly between new development and the New Braunfels community.

Learn More About Developer Driven Projects and Impact Fees

Impact fees help fund the infrastructure needed to support new development, so growth pays for the growth it creates. NBU’s Impact Fee Policy aligns with local and state requirements. This section provides the most recent schedules and explanations of those fees.

The 2023 Impact Fee Report explains the study and methodology used to determine the updated fee structure. This document gives context to the numbers so developers can understand how fees are calculated and applied.

Ready to start a developer driven project? NBU provides a suite of reference forms and submittals to help you share required information for initial review and plan approval. These include the project information form, construction plan review application, service area maps, and more — all designed to support clear and complete submissions.

In addition to submittal forms, you’ll find supporting documents like the design criteria checklist and easement requirements. These help guide you through specific elements of planning and documentation for infrastructure work under NBU’s standards.

Developer Submittal Intake

MM slash DD slash YYYY
Name(Required)
Address

Developer Information

Company Profile(Required)
Point of Contact
Email

Contractor Information

Company Name
Point of Contact
Email
Submittal
Plat Submittal Type(Required)
TxDOT Utility Permit Required?(Required)
Application Type(Required)

Complete the corresponding checklist for the application selected above.

Max. file size: 100 MB.
Select all applicable Letter of Certification (LOC) submittal requirements included in this submission. Combine application and all supporting documentation in a single PDF. 𝙉𝙤𝙩𝙚: 𝘼𝙥𝙥𝙡𝙞𝙘𝙖𝙩𝙞𝙤𝙣 𝙬𝙞𝙡𝙡 𝙣𝙤𝙩 𝙗𝙚 𝙧𝙚𝙫𝙞𝙚𝙬𝙚𝙙 𝙪𝙣𝙩𝙞𝙡 𝙖𝙡𝙡 𝙨𝙪𝙗𝙢𝙞𝙩𝙩𝙖𝙡 𝙧𝙚𝙦𝙪𝙞𝙧𝙚𝙢𝙚𝙣𝙩𝙨 𝙖𝙧𝙚 𝙘𝙤𝙢𝙥𝙡𝙚𝙩𝙚𝙙.
Untitled
Max. file size: 100 MB.
Select all applicable Construction Plan Checklist submittal requirements included in this submission. Combine application and all supporting documentation in a single zipped file. 𝙉𝙤𝙩𝙚: 𝘼𝙥𝙥𝙡𝙞𝙘𝙖𝙩𝙞𝙤𝙣 𝙬𝙞𝙡𝙡 𝙣𝙤𝙩 𝙗𝙚 𝙧𝙚𝙫𝙞𝙚𝙬𝙚𝙙 𝙪𝙣𝙩𝙞𝙡 𝙖𝙡𝙡 𝙨𝙪𝙗𝙢𝙞𝙩𝙩𝙖𝙡 𝙧𝙚𝙦𝙪𝙞𝙧𝙚𝙢𝙚𝙣𝙩𝙨 𝙖𝙧𝙚 𝙘𝙤𝙢𝙥𝙡𝙚𝙩𝙚𝙙.
Untitled
Max. file size: 100 MB.
Upload the Utility Connection Sketch below.
Max. file size: 100 MB.
Upload the Engineering Design Report below.